Tuesday, October 1, 2019
Quality Associates Essay
Quality Associates, a consulting firm, advises its clients about sampling and statistical procedures that can be used to control their manufacturing processes. In particular application, a client gave Quality Associates a sample of 800 observations taken during a time in which that clientââ¬â¢s process was operating satisfactorily. The sample standard deviation for these data was 0.21; hence with so much data, the population standard deviation was assumed to be 0.21. Quality Associates then suggested that random samples of size 30 be taken periodically to monitor the process on an ongoing basis. By analyzing news samples, the client could quickly learn whether the process was operation satisfactorily. When the process was not operation satisfactorily, corrective action could be taken to eliminate the problem. The design specification indicated the mean for the process should be 12. The hypothesis test suggested by Quality Associates follows. : : Corrective action will be taken any time is rejected. The dataset ââ¬Å"Quality.savâ⬠contains each of four samples, each of size 30, collected at hourly intervals during the first day of operation of the new statistical control procedure. Managerial report 1. Conduct a hypothesis test for each sample at the 0.01 level of significance and determine what action, if any, should be taken. Provide the test statistic and the p-value for each test. 2. Compute the standard deviation for each of the four samples. Does the assumption of 0.21 for the standard deviation appear reasonable? 3. Compute limits for the sample mean Ã⦠around such that, as long as, a new sample mean is within those limits, the process will be considered to be operation satisfactorily. If Ã⦠exceeds the upper limit or if below lower limit, corrective action will be taken. These limits are referred to as upper and lower control limits for quality purposes. 4. Discuss the implications of changing the level of significance (à ±) to a larger value. What mistakes or error (type I or type II error) could increase if the level of significance is increased?
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment
Note: Only a member of this blog may post a comment.